Hi Jacob,
Thanks for your quick response.
I have already created 2 materials one with item category grp NORM and another with LEIH which is a returnable packaging material.
I WANT TO DO AUTOMATIC PACKING.
1. I did setting in delivery type.
2. In Delivery Item Category.
3. Packing instructions. POP1
4. packing instructions determination records. POF1
when i am running process order and delivery automatic packing is not happening even though i did all the back settings of automatic packing.
Kindly help me out where i missed the link, Thanks in advance.