hi all
describe our problem:
when insert PIR with MD61 on festive dates, the system return the message "Date will be displaced to the next earlier workday" (Message no. 6P4349), We need to leave this PIR on holidays date, because SNP calculates PIR alwyas on Wednesdays without considering the Factory Calendar. Is it possible to disable this message and make sure that R3 accepts any date?
thanks in advance